Backtiming

I had an assistant once who developed the concept of “the Ritter factor” when estimating time.  The basic concept was that if I said something would take a certain amount of time, that amount needed to be multiplied by 4.5 to determine the actual time required.  While not admitting to the accuracy or even existence [...]

Follow

Get every new post delivered to your Inbox.

Join 1,311 other followers