I had an assistant once who developed the concept of “the Ritter factor” when estimating time. The basic concept was that if I said something would take a certain amount of time, that amount needed to be multiplied by 4.5 to determine the actual time required.
While not admitting to the accuracy or even existence of this factor, I can state that Thanksgiving‘s biggest challenge is time. Continue reading